In its decades of serving the State College region, these are some
of the companies that have selected Veronesi Building and Remodeling,
Inc. to construct their commercial buildings.
Park Forest Middle School Gym Renovation
VBR served as the construction manager for the renovations to this 6,000sf gymnasium. The project included removing the existing rubber flooring system and all ceiling and floor mounted athletic equipment. A new chair lift was installed to the upper stage level within the gym and masonry restoration completed. A new rubber floor surface was installed along with new basketball hoops, bleachers, and overhead dividing curtain.
Project was completed over summer break and was completed in time for the return of students for the fall start of school.
Project was completed on time and on budget.